what is meaning for pcc 1 4 8 - opera-parciparla.ch

1 4 8 PCC HOW MUCH CEMENT WANTED FOR 1 CUMETER?, Apr 24, 2009 0183 32 Assuming that your proportions are by weight then you have 1 part cement, 4 parts fine aggregate and 8 parts coarse aggregate totaling 13 parts The density of the finished concrete will be about 2300kg/m3 So start with 100kg of OPC Ordinary Portland Cement then fine aggregate is …

How to Prepare Rate Analysis of PCC Work,Rate Analysis …

Plain Cement Concrete (PCC) Work Procedure. Plain cement concrete is the mixture of cement, fine aggregate(sand) and coarse aggregate without steel. PCC is a...

Rate analysis for PCC 1:4:8 (M7.5) – calculate quantity

Ans. INR 4845 is cost and rate analysis for 1 cum PCC 1:4:8 (M7.5). step 11 : rate per sq m for PCC 1:4:8 (m7.5), consider thickness of concrete structure is 150mm thick so Area of concrete structure in square metre = 1m3/0.15m = 6.67, 6.67 m2 concrete structure cost = INR 4845, so rate per sq m for PCC M7.5 = 4845/6.67 = INR 726.

cement consumption in PCC 1:4:8 Archives - CivilEngineerx

cement consumption in PCC 1:4:8 and M7.5. cement consumption in PCC 1:4:8 and M7.5,how to calculate quantity of cement in PCC, in this topic we know about how to calculate quantity of cement in PCC and cement consumption in PCC 1:4:8.we know that we have several grade of ….

разход на цимент в PCC 1:4:8 и M7.5 - бетон

консумация на цимент в PCC 1:4:8 и M7.5, изчислете количеството циментов пясък и инертния материал за бетон клас M7.5 и съотношението на смесване е 1:4:8 и водно-циментното съотношение

pcc 1 4 8 1 cum

VOLUME-II -Price Bid containing Bill of Quantities, B1 Providing and laying PCC 1:4:8 bed, 500 CUM B3 Providing and Laying PCC 1:2:4 in... Required Cement quantity - GeekInterview. ... Apr 24, 2009· 1:4:8 PCC HOW MUCH CEMENT WANTED FOR 1 CU, Assuming that your proportions are by weight then you have 1 part cement, 4 parts fine aggregate and ...

What is 1:4:8 foundation PCC? - Quora

Answer (1 of 6): M7.5 grade of concrete In M7.5 grade of concrete M stand for mix and numerical figure 7.5 is stand for compressive strength of 150 mm cube size after 28 days of curing. So compressive strength of M7.5 grade of concrete is 7.5N/mm² and mix ratio in M7.5 grade of concrete is about...

What is plain cement concrete 1:4:8? - Quora

Answer (1 of 8): The numbers have to do with the ratio of different sizes of aggregate, sand, gravel and cement and the compressive strength of each. I hope this helps Different mixes (M) come in various mix proportions of the various ingredients of cement, sand and coarse aggregates. For instan...

[Solved] In PCC (Plain Cement Concrete) of ratio 1 : 2 : 4, the ratio

Q6. Quantity of cement required (in terms of 50 kg. bags) to cast a 5 m × 4 m slabs (RCC 1 ∶ 2 ∶ 4) of thickness 10 cm is approximately: Q7. The lower water-cement ratio in concrete produces: Q8. Decrease by 10% aggregate in concrete: Q9. The process of repairing concrete work that has been damaged (perhaps due to inferior work) is called

cement consumption in PCC 1:4:8 and M7.5 - Civil Sir

51 bags (2559 kg) cement consumption in pcc 1:4:8 100m2 & 150 mm thick pcc slab. sand quantity consumption in PCC 1:4:8. Part of sand in mix = 4/13. 1m3 = 35.32 cuft. Dry volume =23.1 m3. Volume of sand = (4/13)×23.1 × 35.32 cuft. Volume of sand = 251 cuft. if one tractor trolly has = approx =80 cuft. Than no. of tractor trolly of sand